Fixed stacked charter DBG1-10

Aircraft charter for the single-station stack, rack at the top left there is a small belt. Cement bag packed by the belt conveyor (the main belt conveyor) is transferred to a small belt conveyor, conveyor belt from the small into the chute. Package can be part of cement chute down to the loading door and crashing inside of the door mounted in the formation of load switch, then pallets down, immediately dropped to a certain location, cement bag and travel switch disengagement, pallets stopped declining, wait for the next package of cement into the station, and repeat the process on a package of work, so repeatedly, that stack to 10 package, cement bag their own turn to have put away the trolley, and then upward movement of pallets to the initial position, repeat the process. Continue reading